BUILDING
INSPECTIONS
Rodney
Wilson, Building Official/Code Enforcement Officer
If you are
planning a new deck, pool, outbuilding, addition or other
home improvement project, chances are that you will need a
permit. You will not need a permit for shingles,
replacement windows or vinyl siding. Contact Rodney Wilson, Building Official to
get your questions on building permits answered.
Building permit required; fees.
No permit to begin work for new
construction, alteration, removal, demolition or other
building operations shall be issued until the fees
prescribed in this section have been paid to the town
treasurer, nor shall an amendment to a permit necessitating
an additional fee because of an increase in the estimated
cost of the work involved be approved until the additional
fee shall have been paid. Furthermore, should construction
begin without first obtaining the necessary permit, the fees
shall be one and a half times these rates.
(1) Zoning
permit. A certificate of zoning must be acquired for
designated building permits at an additional fee of $15.00.
(2) Plan review, new residential
construction including additions or alterations 750 square
feet or greater, $0.01 per square foot, with a minimum
charge of $25.00. New commercial/industrial/retail construction including additions and
alterations, $0.01 per square foot, with a minimum charge of
$50.00.
(3) Additions, including
porches, decks, and carports, $0.12 per square foot, with a
minimum charge of
$30.00
(see subsection (1),
above).
(4) Demolition, $35.00.
(5) Doublewide
manufactured homes, $0.06 per square foot (including
basement, garages, decks, etc.), with a minimum charge of
$45.00 (see subsection (1), above).
(6) Electrical service, $30.00.
(7) Garages (detached) and
outbuildings, $0.10 per square foot, with a minimum charge
of $20.00 (see subsection (1), above).
(8) Heat pumps, $30.00.
(9) Remodeling, $0.12
per square foot, with a minimum charge of $30.00.
(10)
Reroof or residing, $20.00 each or $35.00 if both are done
at the same time.
(11) New residential, $0.12 per square foot (including basement,
garages, decks, etc.), with
a minimum charge of $45.00 (see subsection (1), above).
(12) Singlewide
manufactured home, $45.00 (see subsection (1), above).
(13) Swimming pools,
$0.10 per square foot, with a minimum charge of $30.00 (see
subsection (1), above).
(14) Erection of an
advertising sign or structure, $0.12 per square foot of
signage, with a minimum charge of $20.00 (see subsection
(1), above).
(15) Moving structure
from one position to another on the same lot or from one lot
to another, a minimum charge of $20.00.
(16) New
commercial/industrial/retail construction and additions,
$0.17 per square foot of finished floor area, with a minimum
charge of $30.00.
(17)
Temporary Certificate of Occupancy, $10.00 and final
Certificate of Occupancy, $25.00.
To download a
Building Permit click here.
To download a application for
Zoning Compliance click here.
